CTI Marketplace
94-01: Drift Testing - Scale Up From Test Cell To Field Acceptance Test
Regular price
$20.00 USD
Regular price
Sale price
$20.00 USD
Unit price
per
Couldn't load pickup availability
In 1989 Florida Power Corporation (FPC) agreed to install helper-cooling towers at their Crystal River Generating Station to cool circulating water discharged to the Golf of Mexico. As a result of agreements with the environmental agencies a maximum allowable helper cooling tower drift rate of 0.002 percent was required, including compliance field-testing. An R&D drift-testing program was conducted in 1990 in a cooling tower test cell to confirm that the drift rate limit would be achievable when field-tested using EPA Method 5. The helper towers are now in commercial operation and recent field drift testing has validated the results of the R&D program.
Materials
Materials
Shipping & Returns
Shipping & Returns
Dimensions
Dimensions
Care Instructions
Care Instructions
Image with text
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Free Shipping
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Hassle-Free Exchanges
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.