Skip to product information
1 of 2

CTI Marketplace

92-10: Reduction of Cooling Tower PM10 Emissions Due to Drift Eliminator

Regular price $20.00 USD
Regular price Sale price $20.00 USD
Sale Sold out

Separate isokinetic EPA Method 13A and heated cascade impactor tests were performed on three cooling towers before and after drift eliminator modifications. The modifications consisted of installation of Munters D-15 eliminators over the existing eliminators. The reduction of drift and corresponding mineral mass emissions was about 80%.

Materials

Shipping & Returns

Dimensions

Care Instructions

Image with text

Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Free Shipping

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Hassle-Free Exchanges

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.