89-09: Modification of the Induce Draft Cooling Tower at Cross Generating
Research Cottrell constructed the concrete induced draft-cooling tower at Cross Generating Station in 1984. The initial performance test indicated a major tower deficiency. The subsequent performance tests I '85-'87 indicated a drastic degradation in performance. The tower was upgraded in April '88 during the scheduled plant outage of three weeks. The major modification included replacing the existing fill (approx. 180,000 cubic feet), nozzle assemblies, drift eliminators and adding a cross-flow section. A performance test of modified tower is to be conducted in June-July. Results will be discussed.
Materials
Materials
Shipping & Returns
Shipping & Returns
Dimensions
Dimensions
Care Instructions
Care Instructions
Image with text
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Free Shipping
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Hassle-Free Exchanges
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.