CTI Marketplace
89-04: Ultimate Heat Sink Thermal Performance Test at the River Bend Station
Couldn't load pickup availability
This paper describes the work associated with planning, preparations, and executionof these tests. This non-conventional design tower would serve as the ultimate heat sink for the reactor plant following a postulated design basis accident. A temporary heat source was used, consisting of the three package boilers and associated equipment to supply steam to two temporary heat exchangers. The basin water was circulated through temporary piping to the heat exchangers and back through temporary piping to the heat exchangers and back through the tower frill, cooling the water before entering the basin. This was a unique test, that required special planning preparations, execution, and interface with an operational nuclear plant.
Materials
Materials
Shipping & Returns
Shipping & Returns
Dimensions
Dimensions
Care Instructions
Care Instructions

Image with text
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Free Shipping
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Hassle-Free Exchanges
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.