86-12: Activation of a New Tower Facility
The activation of a new heat exchanger, pipeline and components, and cooling tower systems, can present problems not found in modifications or additions to existing systems. This paper will address some of the unexpected events that surfaced during activation of the cooling tower systems, piping, and valving and the steps taken to correct the occurrences.
Materials
Materials
Shipping & Returns
Shipping & Returns
Dimensions
Dimensions
Care Instructions
Care Instructions
Image with text
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Free Shipping
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Hassle-Free Exchanges
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.