Skip to product information
1 of 2

CTI Marketplace

75-05: Proper Cooling Tower Operation Makes Money

Regular price $20.00 USD
Regular price Sale price $20.00 USD
Sale Sold out

This example indicates an 8.4% differential in product recovery from 
the overhead condenser and a dollar cost which could easily pay for 
the cooling tower involved in less than two weeks. 
Let us go through this same exercise on an air conditioning unit. Consider a 590-ton absorption type machine. Again, we will assume a five degree rise in cold water temperature due to poor operation and maintenance conditions. In this case we will assume a normal 
Gulf Coast air conditioning cold water temperature design of g5op 
and a goop cold water in actual operation on a 2120 GPM cooling tow

Materials

Shipping & Returns

Dimensions

Care Instructions

Image with text

Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Free Shipping

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Hassle-Free Exchanges

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.