Skip to product information
1 of 2

CTI Marketplace

TP22-09: Temporary Cold Water Basin

Regular price $20.00 USD
Regular price Sale price $20.00 USD
Sale Sold out
 More payment options
With outage and shutdown intervals extending to 5-8 years, routine cooling tower maintenance, such as basin cleaning, below water structure replacements and concrete basin inspections, are being pushed beyond OEM-recommended frequencies. We have developed a proven system that allows a cooling tower to remain in operation with the basin drained so the above maintenance can be completed. This paper will detail the system including a review of two recent cases studies at a large refinery in terms of reduced outage costs, increased production and overall plant safety.

Image with text

Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Free Shipping

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Hassle-Free Exchanges

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.