Skip to product information
1 of 2

CTI Marketplace

16-20: Predicting Time To Clean: Avoid Unscheduled Outages And Extend Asset

Regular price $20.00 USD
Regular price Sale price $20.00 USD
Sale Sold out

There has been a shift in industrial economic philosophy to risk-based maintenance, which comes with inherent hazards of pushing plant equipment to unscheduled downtime associated with extensive fouling and/or failure. Methods have been developed to avoid such pitfalls. Modeling and optimization of heat exchanger operational conditions and cooling water chemistry resulted in findings to improve heat exchanger fouling ruin rates, eliminate the scheduled need for bundle cleaning, and increase the life of equipment. The method processes will be illustrated, as well as laboratory findings and field case studies that document marked improvements.

Materials

Shipping & Returns

Dimensions

Care Instructions

Image with text

Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Free Shipping

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Hassle-Free Exchanges

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.