CTI Marketplace
14-07: Restoration of Concrete Cooling Towers Damaged by Reinforcing Steel
Couldn't load pickup availability
This paper describes the ongoing restoration of two reinforced concrete hyperbolic cooling towers that exhibited extensive deterioration due to corrosion of the embedded reinforcing steel. The cooling towers were constructed in 1983 and 1985 and are each 453 feet tall reinforced concrete shell structures. The restoration work included the removal and replacement of more than 200,000 square feet of concrete and the installation of an impressed current cathode protection (ICCP) system to protect the embedded reinforcing steel from corrosion. The cost of the restoration work is approximately $53 million.
Materials
Materials
Shipping & Returns
Shipping & Returns
Dimensions
Dimensions
Care Instructions
Care Instructions

Image with text
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Free Shipping
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Hassle-Free Exchanges
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.