CTI Marketplace
13-21: Expedited Field Erected Cooling Tower Replacement/upgrade with Limited
Couldn't load pickup availability
An innovative replacement and upgrade of field erected cooling tower over an existing basin with limited site access. An aggressive construction schedule of eight weeks was followed with a limited total plant outage of three days. Cooling Tower performance was maximized including a decision mid project schedule to increase the tower footprint by approximately 25% without increasing the size of the existing cold water basin. Tower was completely stick built and erected two weeks ahead of schedule with zero safety incidents.
Materials
Materials
Shipping & Returns
Shipping & Returns
Dimensions
Dimensions
Care Instructions
Care Instructions

Image with text
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Free Shipping
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Hassle-Free Exchanges
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.