12-01: Natural Draft Cooling Tower Ring Replacement: Unique Construction
This paper presents the technical, logistical and scheduling challenges encountered to complete the project during a 49 day outage, which included preassembly of sixty-four (64), 15-ton pultruded structural fiberglass modules. More than 150 workers logged 94,000 man hours with zero safety incidents, (2) days ahead of schedule, allowing early plant restart and commissioning. The completed tower provides PPL additional generation capacity while distributing 261,000 gpm, is 45 feet high and 400 feet in diameter.
Materials
Materials
Shipping & Returns
Shipping & Returns
Dimensions
Dimensions
Care Instructions
Care Instructions
Image with text
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Free Shipping
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Hassle-Free Exchanges
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.