10-19: Systematic Approach To Performing, Documenting And Reporting Inspections
Regular price
$20.00 USD
Regular price
Sale price
$20.00 USD
Unit price
per
A systematic approach is applied to the inspection of field-erected cooling towers. Procedures for inspecting structural, mechanical, and performance characteristics are investigated with an emphasis on identifying common failures and deficiencies. The distinction between counter-flow and cross-flow cooling tower inspections is examined. In conclusion, a method is outlined for documenting inspection results and the reporting process.
Materials
Materials
Shipping & Returns
Shipping & Returns
Dimensions
Dimensions
Care Instructions
Care Instructions
Image with text
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Free Shipping
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Hassle-Free Exchanges
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.