CTI Marketplace
05-02: Online Refurbishment of four Large Natural Draft Cooling Towers
Couldn't load pickup availability
Many large power/petrochemical plants have older cooling towers which are in need of major repairs but shutting down these towers will result in large production losses. A project was started in which the water distribution system and the splash pack grids of four existing natural draft cooling towers at a large petrochemical plant were to be replaced without shutting down the water flow to the cooling towers. The water flow to typically 10% of a given tower was shut off after the installation of butterfly valves. The existing packing in this area was then removed and replaced with new high performance slash packing. The work on the first two towers is scheduled for completion in July 2004. Performance tests on these two towers are scheduled for the southern hemisphere summer 2004/2005. The work on the remaining two towers is scheduled for completion at the end of 2005.
Materials
Materials
Shipping & Returns
Shipping & Returns
Dimensions
Dimensions
Care Instructions
Care Instructions

Image with text
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Free Shipping
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Hassle-Free Exchanges
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.