Skip to product information
1 of 2

CTI Marketplace

03-13: Correcting Sedimentation Problems at American Electric Power's

Regular price $20.00 USD
Regular price Sale price $20.00 USD
Sale Sold out

American Electric Power's Conesville Generating Station has had a history of chronic problems with silt build-up at the river intake structure. This paper will describe modifications that were completed to the area in front of the intake and to the upstream riverbank that successfully eliminated the sedimentation accumulation problem. Analytical and hydraulic model studies conducted during the design optimization process and construction techniques utilized to minimize impact to the operating generating station will also be reviewed.

Materials

Shipping & Returns

Dimensions

Care Instructions

Image with text

Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Free Shipping

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Hassle-Free Exchanges

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.