Skip to product information
1 of 2

CTI Marketplace

TP14-20: Premature Failure of Open and Closed Recirculating Cooling Water and Fire Water Systems Piping and Equipment: Are You Responsible?

Regular price $20.00 USD
Regular price Sale price $20.00 USD
Sale Sold out
In recent years there have been a relatively large number of unexpected, premature failures of system water piping associated with HVAC, Process Cooling, and Fire Water systems in modern buildings designed for commercial, residential, health care, governmental, and manufacturing occupancy.    Facilities designed to provide long term service life are failing due to severe corrosion resulting in complete penetration of circulating water piping as a result of severe pitting type attack.  This severe corrosion is occurring on the water side in both galvanized and un‐galvanized carbon steel and copper piping.  It is not uncommon to encounter systems where complete penetration has occurred within 4 to 8 years after initial commissioning, even though it appears to the building management team, right up until the leaks start to flow, that an appropriate water treatment program is in place.  These premature failures are now finding their way into the courts, as attempts are made to determine responsibility and to seek compensation for these failures, resulting in severe reduction in asset value, excessive legal cost, and disruption of occupants.

Materials

Shipping & Returns

Dimensions

Care Instructions

Image with text

Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Free Shipping

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Hassle-Free Exchanges

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.